Installation and commissioning of sealing auxiliary system?
Sealing auxiliary system is a common auxiliary equipment in industry, mainly used for sealing mechanical equipment. In the production and operation process of various mechanical equipment, there will be a certain degree of leakage. If not treated, it will lead to an increase in production costs and the existence of safety hazards. The sealing auxiliary system can reduce or eliminate the leakage problem of mechanical equipment and improve the operating efficiency of the equipment through a series of technical means.
The installation and debugging of the sealing auxiliary system are key steps to ensure its normal operation. The following will provide a detailed introduction to the installation and debugging of the sealing auxiliary system.
1、 Installation of sealing auxiliary system
Before installing the sealing auxiliary system, the following work needs to be done:
1. Selection of installation location: The installation location of the sealing auxiliary system should be selected according to specific circumstances, generally near the leakage point of the mechanical equipment, in order to promptly deal with the leakage situation.
2. Preparation before installation: Before installation, it is necessary to inspect the sealing auxiliary system components to ensure that they are intact, clean, and hygienic.
3. Layout design of sealing auxiliary system: Based on the actual situation, the layout design of the sealing auxiliary system should be carried out first to ensure the normal coordination and interconnection of components such as pipelines and valves among the components of the sealing auxiliary system.
4. For the sealing auxiliary system of large equipment, it is necessary to calculate the position of pipelines and supports in advance in order to facilitate better installation on site.
After the preparation work is completed, the installation of the sealing auxiliary system can be carried out according to the following steps:
Step D: Connect the pipes, valves, and other components in sequence from the inlet pipe of the sealing auxiliary system until the last one.
Step 2: When the sealing auxiliary system encounters a potentially explosive oil and gas environment, the electrical control cabinet and wires should be fixed to ensure safety.
Step 3: Connect the outlet pipeline of the sealing auxiliary system to the leakage point of the mechanical equipment.
Step 4: Check if the fasteners and pipe connections are secure and reliable. If there is any looseness or damage, tighten or replace the parts again.
2、 Debugging of sealing auxiliary system
After the sealing auxiliary system is completed, it needs to be debugged to ensure its normal operation. Below are the specific steps for debugging the sealing auxiliary system:
1. Turn on the sealing auxiliary equipment: Connect the power supply of the sealing auxiliary equipment and turn on the device.
2. Adjust valves: Adjust the valves of the sealing auxiliary equipment according to the on-site needs to ensure that the operating pressure of the equipment is appropriate.
3. Check for leaks: Check if there are any leaks in the sealing auxiliary equipment. If there is any leakage, it needs to be rechecked and adjusted.
4. Check the electrical system: Check if the electrical system of the sealing auxiliary equipment is working properly. If any abnormalities occur, they need to be repaired in a timely manner.
5. Trial operation: After all inspections are completed, conduct a trial operation. During the trial operation, the equipment should be operated relatively slowly, and the condition of each part should be observed for looseness, oil leakage, and other conditions. If there are any abnormalities, they should be dealt with in a timely manner until the equipment is running normally.
3、 Precautions
1. During the installation and commissioning of the sealing auxiliary system, it is necessary to maintain on-site safety, use safety protection facilities, and strictly prohibit approaching the equipment during operation.
2. To ensure the normal operation of the device after debugging, multiple trial runs can be conducted until the device reaches stable operation.
3. When carrying out maintenance and upkeep work, the power supply of the sealing auxiliary system should be turned off first to avoid unnecessary injury.
In short, the installation and commissioning of the sealing auxiliary system need to be strictly carried out in accordance with standard operating procedures to ensure safety during on-site construction and operation. Only correct installation and operation can ensure the long-lasting and stable operation of the sealing auxiliary system, achieve the expected effect of the manufacturer, guarantee the normal operation of the equipment, and reduce energy consumption.


National Consultation Hotline: 0515-85420179
Chairman: Xia Xinlong 13901415576
General Manager: Xia Wei 13901415500
Marketing Department Director: Xia Maolin 18752209678
Jiangsu Regional Manager: Wang Haibin 13770293619
Shandong Regional Manager: Chen Yuehua 15064357139
Liaoning Regional Manager: Xia Xinhai 18994814598
Hebei Regional Manager: Qi Wenjian 18133817111
Phone: 0515-85421879
Fax: 0515-85420181
Email: sales@jsytlt.com